around the proposed outer ring road under the Meerut Master Plan 2021. The proposed industrial park lies industrial area at Hapur or Mawana road or the
in Ahmedabad , about over 12%, or 2.81 lakh units Ahmedabad and Surat has maximum number of vacant houses. A large number of these units belong to investors charges. In 2011-12, a total of 9.07 lakh residential units were sold in the state. In 2010-11, 10.05 lakh property deals were registered